House exterior renovation gallery, London
London Stonemasonry have renovated, refurbished and restored hundreds of house exteriors across London and the South East. See the gallery on this page for a few recent examples of our work.
We offer complete facade transformation packages, including complete stone bay windows with glass installation, brick repointing, brick restoration, stonework replacement, render removal, decoration, and steps and paving. We’re committed to enhancing the beauty and value of your property.
Click on the photos below to enlarge them. The pictures were taken while we were working on houses across London, including: Battersea, Brixton, Brockley, Clapham, Clapham Junction, Dulwich, Ealing, Highbury, Peckham, Richmond, St John’s Wood, Streatham, Sydenham and Wandsworth Common.
See also: our case studies for more detailed information about our work, and before-and-after photos.
Contact us to discuss your project, we offer free quotations.
Projects in this gallery include
- Highbury New Park, Highbury, N5. A leaking asphalt roof had rotted the timbers of this Victorian portico, leaving the soffit hanging away from the joists and the stone beginning to crumble. The three owners chose a new lead roof, and we stripped the non-breathable paint, pinned the cracked arches with stainless steel and replaced the copings with wider ones that throw rainwater clear of the stone. Our stonemasons shaped the Bath stone repair mortar by hand to match the original detail, then the team decorated the portico in Keim breathable mineral paint. Completed in around three weeks.
- Brodrick Road, Wandsworth Common, SW17. The London Stonemasonry team raked out the cement pointing on this Victorian house and repointed it in NHL 3.5 natural hydraulic lime mortar. We carved and fitted a new pier cap for the gate and a new base for the porch column, replaced damaged bricks and restored the stone sills, bay and front wall before decorating in Keim breathable mineral paint. Completed in four weeks.
- Union Road, Brixton, SW4. Pollution had stained the light gault brickwork of this late Victorian house, and layers of non-breathable paint hid its stone detailing. We removed the paint with a low grade acid paste and the DOFF steam cleaning system, restored the brickwork, and repointed the front and rear elevations in a lime mortar the owners chose from six samples. The team then repaired the stone corbel course, window lintels and floral bay capitals and decorated them in Keim breathable mineral paint. Completed in just over eight weeks.
- Hale Gardens, Ealing, W3. We cleaned the stone dressings and red brick facade of this Edwardian house with the DOFF steam cleaning system, lifting decades of pollution, algae and staining without harming the masonry. The team then replaced the worn stone window sills in Peakmoor Yorkstone, the closest match to the original, using matching bricks and colour-matched pointing where we opened up the brickwork. Completed in three and a half weeks.
- Fentiman Road, Battersea, SW8. Years of hard cement pointing had trapped moisture and spalled the brickwork of this late Victorian terraced house. We cut out the cement from the front and rear elevations, replaced damaged bricks with reclaimed imperial bricks, pinned stone with stainless steel threaded bar and indented new Bath stone, and repaired the corbels, capitals and balustrade in a matching Bath stone mix. The team repointed in colour-matched NHL lime mortar with a weather struck finish and cleaned the facade with the DOFF system. Completed in five weeks.
- Barrow Road, Streatham, SW16. Years of neglected roofing had saturated and cracked the portico of this late Victorian house, and the front steps had shifted. We templated every detail before dismantling it, laid new foundations and rebuilt the portico in carved Bath stone with a new lead roof, then installed new York stone steps and decorated the stone in mineral paint. Completed in four weeks on site, after six weeks of templating and carving.
- Bellevue Road, Wandsworth Common, SW17. Water getting into the parapet of this Georgian property had eroded the brick corbels and wall plate behind it, pushing the cornice and parapet forward. We took them down, carried out brick replacements and repointing, and rebuilt the cornice in two courses of cast stone made from templates of the original, with the parapet on top and lateral ties installed. The team moved the old stone out and the new stone in early in the morning by electric hoist to keep the busy street clear. Completed in three weeks on site.
- St John’s Wood, NW8. An architect’s report found that the stone pediment of this Grade II listed home had cracked and slipped forward, because heavy stone at the front sat on lighter brickwork and render behind. We took the failed brickwork beneath down to solid brickwork, rebuilt and rendered it, then rebuilt the pediment in sections of new carved stone and decorated it to match. Completed in nine weeks, three of them on site.
- Shaftesbury Road, Richmond, TW9. A previous contractor had cut and laid the stone steps badly, so we designed the front garden again from scratch. The team built a new step layout with paving and planting areas, installed a boundary stone plinth, and fitted replicas of the original railings and gate. Completed in three weeks.
- Marnock Road, Brockley, SE4. Cement pointing and non-breathable paint had brought damp into this Victorian terraced house. We stripped the paint from the brick and stone, steam cleaned the facade, cut out the cement with variable speed grinders and replaced damaged bricks with reclaimed London stocks and soft reds. The team repointed in a lime mortar the owner chose from samples, repaired the door surround, lintels and floral bay capitals, and decorated the stone in breathable masonry paint. Completed in around three weeks.
- Lavender Sweep, Battersea, SW11. Cement pointing and non-breathable paint had caused damp inside this large Victorian building and were eating into its brick and stone. We stripped the paint and steam cleaned the brickwork, replaced damaged bricks with reclaimed yellow gault bricks, cut out the cement pointing and repointed in colour-matched lime mortar. The team repaired the lintels, string courses and floral capitals before decorating them in breathable masonry paint. Completed in around seven weeks, and the damp inside has stopped.
- Ivanhoe Road, Peckham, SE5. Subsidence had pulled the double bay window of this Victorian terraced house away from the building, and it had already been taken down for safety. We templated the bays of neighbouring houses, installed new foundations to a structural engineer’s design and rebuilt the double bay in new stone, working with the building’s earlier movement so the stones met the roof line correctly. Completed in three weeks up to roof height.
- Honeywell Road, Clapham, SW11. Failing pointing and weathered stone detailing were spoiling the front of this house. We raked out and repointed the brickwork in a colour the client chose from sample gauges, replaced damaged bricks with reclaimed gault bricks from a yard on the Essex and Suffolk border, and restored the stonework with specialist repair mixes before redecorating it in breathable mineral paint. The team also repointed the front wall in matching lime mortar and redecorated the railings. Completed in three weeks.
- Friern Road, East Dulwich, SE22. A previous rebuild of this bay window had not stopped its movement, and the sills under the first floor windows were moving too. Working with our structural engineer, we propped the facade, dismantled the bay, poured a new foundation and replaced the decayed timber bressummer with a steel beam. The team then rebuilt the bay in newly carved Bath stone from templates of the originals, with a lead-lined roof under the parapet. Completed in around four weeks, including repointing and decoration.
- Fransfield Grove, Sydenham, SE26. Rainwater from a neglected bay roof had saturated and weakened the stones of this Victorian bay window. While the main contractor built a new foundation to building control’s depth, we carved replacement stone in our workshop from templates of the original, then built the bay, toothed in reclaimed London stock bricks and added a new lead roof. We gave the sash window makers exact opening sizes so the new windows fitted closely. Completed in three weeks.